)
Backfill grouting for Thanontok Terminal Station
Grouting materials for EPB Tunnel
in Bangkok
The Thanontok Terminal Station is a twin bored-tunnel underneath Rama IV road, one of the busiest roads in Bangkok. It is part of the deepest underground structures of Bangkok. Tunnel works like these, in crowded urban environments, require a modern tunneling technology, like EPB tunneling, that meets the targets on time and on budget.
Efficient backfill grouting requires ideal materials and a well experienced team to respond to a wide range of conditions in a short matter of time. As a well established drilling fluid supplier in Thailand, we have a good knowledge of local ground conditions in Bangkok which are usually characterized by Bangkok soft clay on the shallow layers and hard clay and sand deposits underneath. Our mud engineers were able to predict ground conditions and advice the most efficient backfill grout composition for this project.
Project Responsibilities
Diameter: 4.12 m
Length: 680 m
Project Challenges
Dominantly clay with sand layers
Water conditions: Bangkok tap water
Delivered Drilling Fluid Products
)
SIM Retarder
Liquid retarding agent for two-component backfilling grout system.
)
Sodium Silicate
Liquid sodium silicate adapted for backfill-grout applications.
)
On-Site Export Support for Your Project
Our experienced team offers on-site consultation and mud management services to ensure optimal performance for your operations. We can prepare tailored mud management plans and deploy skilled mud engineers to any location across Indonesia, providing comprehensive support for your projects.